Material QA/QC Coordinator

at  Webuild

Cooma, New South Wales, Australia -

Start DateExpiry DateSalaryPosted OnExperienceSkillsTelecommuteSponsor Visa
Immediate18 Jul, 2024Not Specified19 Apr, 20245 year(s) or aboveCivil EngineeringNoNo
Add to Wishlist Apply All Jobs
Required Visa Status:
CitizenGC
US CitizenStudent Visa
H1BCPT
OPTH4 Spouse of H1B
GC Green Card
Employment Type:
Full TimePart Time
PermanentIndependent - 1099
Contract – W2C2H Independent
C2H W2Contract – Corp 2 Corp
Contract to Hire – Corp 2 Corp

Description:

The Future Generation Joint Venture brings together the combined engineering experience and expertise of WeBuild, Clough and Lane and has been selected to design construct Snowy 2.0. This project is based within the Snowy Mountains in NSW and will deliver one of the largest pumped hydro schemes in the world.

As an employee of FGJV you will be eligible to participate in a number of employee benefits. FGJV offers an employee benefits programme, including:

  • Retention Bonus Scheme
  • Salary Banding levels
  • Qantas Club Membership discounts

QUALIFICATIONS:

  • Tertiary Qualifications or related discipline such as, Degree in Civil Engineering / Mechanical Engineering or equivalent.
  • White Card

EXPERIENCE:

  • Minimum 5 years’ experience working in the Construction Industry in a similar role – preferred
  • Experience working on large scale construction projects or other suitable projects works
  • Good understanding of Quality Specification (Q6) and ISO AS/NZS 9001 requirements.
  • Sound experience and knowledge of construction materials and related specifications
  • Experience in Microsoft office suite and any EMDS.

Responsibilities:

PURPOSE OF THE ROLE:

The Material QA/QC Coordinator is accountable for review, monitoring and coordination of all material requirements, received or delivered on site and the same time surveillance on construction activities to verify compliance with drawings, specifications of all installed materials.

CORE ACCOUNTABILITIES AND RESPONSIBILITIES:

  • Establish project quality systems for maintaining permanent supplies records and traceability.
  • Ensure compliance of all relevant permanent supplies and accompanying documentation.
  • Coordinate with procurement department for the delivery and inspection of all types of permanent supplies.
  • Arranging testing of permanent supplies in accordance with approved ITPs.
  • Report Non-Conformances immediately following their identification.
  • Assessing Quality Records to ensure compliance and ensuring records are updated in the electronic and hard files in a timely and efficient manner.
  • Review and consult with Quality Inspector on matters of surveillance and inspection, regarding materials.
  • Any other duties as directed by the Quality Control Lead.
    Complete required tasks in a timely manner.
    The above listed authorities & responsibilities are only a guide and may change as directed by your Manager/Supervisor or as per the requirements of FGJV Management.
    These positions are in remote challenging areas with extreme cold temperatures which need to be considered before applying for these roles.
    If you meet the above requirements and would like to work on this iconic project, please apply now.


REQUIREMENT SUMMARY

Min:5.0Max:10.0 year(s)

Construction

Site Engineering / Project Management

Software Testing, Construction

Graduate

Mechanical Engineering, Civil Engineering, Engineering

Proficient

1

Cooma NSW, Australia