Start Date
Immediate
Expiry Date
12 Feb, 27
Salary
75000.0
Posted On
16 Nov, 26
Experience
9 year(s) or above
Remote Job
Yes
Telecommute
Yes
Sponsor Visa
Yes
Skills
Industry
Staffing & Human Resources Services
Executing RTL-to-GDSII physical implementation for TSMC 2nm, 3nm and 4nm mixed-signal IP, covering floorplanning, power planning, placement, clock tree synthesis (CTS), routing and sign-off.
Refining port, macro and isolation-cell placement to minimise crossing connections, routing length and timing violations.
Optimising power grids, clock trees and pre-routing to address shorts, design rule violations, clock skew, latency and setup timing.
Performing static timing analysis (STA), electromigration and IR-drop (EMIR) analysis, and physical verification to support block-level closure.
Projects and technical challenges
D955 MRDIMM3_DQX1, TSMC 2nm | April 2026 – Present: Implementing a 40K-instance sub-block with 18 clocks and frequencies up to 8GHz, addressing port connectivity, power-grid shorts, isolation-cell placement and clock-tree performance.
D965/D966 LPDDR6_DQX3 and DQX1, TSMC 3nm | June 2025 – March 2026: Undertook subsystem and sub-block implementation for 25K–60K instances at 7.2GHz, addressing macro placement, routing length, timing and physical verification issues.
D960 LPDDR6_DQX3 and DQX1, TSMC 3nm | November 2024 – May 2025: Refined floorplans, CTS optimisation cells and routing for 20K–50K-instance designs with clock frequencies up to 12.8GHz, targeting setup violations and physical design constraints.
D910.2 DDR5_ACX2, TSMC 4nm | August – October 2024: Addressed physical verification and critical EMIR violations on a 30K-instance, 8.8GHz design to support sign-off.
Tools: Synopsys Fusion Compiler, PrimeTime, Ansys RedHawk/RedHawk-SC and Synopsys IC Validator.