Start Date
Immediate
Expiry Date
31 Oct, 25
Salary
0.0
Posted On
31 Jul, 25
Experience
0 year(s) or above
Remote Job
Yes
Telecommute
Yes
Sponsor Visa
No
Skills
Good communication skills
Industry
Information Technology/IT
ABOUT US
As one of Australia’s largest energy providers, we are proud of our purpose to lead and accelerate the clean energy transformation for all. We are also proud of our history and of the people who have built our energy capability over the decades, and for the role all our generation sites continue to play in ‘keeping Australia’s lights on’.
Mt Piper was originally built in the 1980s, then stored in near fully assembled state, before being commissioned in 1992 and 1993 (Units 2 and 1 respectively). While initially constructed as 660MW machines, both were upgraded to 700MW in 2009, with Unit one upgraded in 2023 to 730MW, using modern turbine technology, bringing the station total to 1430MW. Importantly, the minimum generation of these units has also been lowered to facilitate the modern requirements of lower minimum generation rates to better match the shape of renewables.
Please refer the Job description for details