Power Management Systems Engineers (SG)_9306 at AMK TECHNOLOGY SDN BHD
Singapore 789381, , Singapore -
Full Time


Start Date

Immediate

Expiry Date

09 Dec, 25

Salary

5000.0

Posted On

10 Sep, 25

Experience

0 year(s) or above

Remote Job

Yes

Telecommute

Yes

Sponsor Visa

No

Skills

Testing, Iec, Industrial Automation, Mms, Automation, Wireshark

Industry

Electrical/Electronic Manufacturing

Description

ABB’s Engineering Center in India designs and ships Power Management Systems (PMS) to various yards (industrial testing and integration sites). Once delivered, these systems must be tested, validated, and troubleshooted onsite before commissioning. The selected engineer will play a key role in this process, ensuring the systems meet ABB’s standards and project requirements.

MUST-HAVE SKILLS

  • Minimum 5–7 years of experiencein PMS, automation, or power-related projects.
  • Strong expertise in IEC 61850 (MMS, GOOSE – multiple editions preferred).
  • Proven experience in testing & troubleshooting PMS and industrial communication networks.
  • Hands-on with diagnostic tools (Wireshark, IEDScout, ITT).
  • Ability to work autonomously in complex testing environments

NICE-TO-HAVE SKILLS

  • Familiarity with ABB 800xA PMS library, Control Builder, Workplace.
  • Understanding of cybersecurity concepts in industrial automation.
  • Experience integrating third-party systems with PMS.
    Job Types: Full-time, Contract
    Contract length: 12 months
    Pay: $4,000.00 - $5,000.00 per month
    Work Location: In perso
Responsibilities
  • Perform Factory Acceptance Tests (FAT) / Yard Testing of Power Management Systems (PMS).
  • Carry out diagnostics and troubleshooting of PMS and industrial communication networks.
  • Focus mainly on the automation side, while maintaining solid understanding of the electrical side (LV/HV switchgear, power distribution).
  • Validate and ensure the correct functioning of PMS applications, including Monitoring and Load Sharing.
  • Work with industrial communication protocols (IEC 61850 MMS/GOOSE, Modbus, Profibus, Profinet, RSTP, HSR, PRP, MRP).
  • Use diagnostic tools such as Wireshark, IEDScout, ITT.
  • Operate independently (70–80% of the time) while delivering high-quality results and documentation.
    Requirements
Loading...