Senior Landing Surveyor at ABEC
New Cairo City, Cairo, Egypt -
Full Time


Start Date

Immediate

Expiry Date

30 May, 26

Salary

0.0

Posted On

01 Mar, 26

Experience

2 year(s) or above

Remote Job

Yes

Telecommute

Yes

Sponsor Visa

No

Skills

Surveying Operation, Formal Reporting, Drawing Conversion, Site Investigation, Control Points, Geodetic Instruments, Engineering Instruments, Data Verification, Level Management, Device Maintenance, AutoCAD, Civil Programs, Total Station, Level, Building Regulations

Industry

Construction

Description
Company Description Established in 1989, ABEC was restructured in 2020 to deliver innovative buildings efficiently and provide full integrated construction service. The company had a wide history of construction projects in various industries in the past, which now decided to take a different route focusing on specific types of buildings. Job Description Manage and produce accurate formal reports in accordance with time table formal reports for surveyor operator. Responsible for all surveying operation for all projects Convert Drawings to surveyor’s points and level. Investigate the site and establish fixed control points for use in making maps, using geodetic and engineering instruments. Verify the accuracy of survey data, including measurements and calculations conducted at survey sites. Responsible for given levels and based points at the sites for all execution sections. Check up the devices to be safe and working well. Revise maintenance time schedules for all the devices. Any mission to be added from the Construction Manager. Qualifications University degree in a related field 4:7 years of experience in a related field experience. Understanding of all surveyor operations and methods Good knowledge of construction methods and materials Professional knowledge in AutoCAD and Civil Programs Professional knowledge in total Station and level Understanding of Building Regulations and other legal guidelines
Responsibilities
The Senior Landing Surveyor will manage and produce accurate formal reports according to the timetable, taking responsibility for all surveying operations across projects. This includes converting drawings to points and levels, investigating sites to establish fixed control points using geodetic and engineering instruments, and verifying survey data accuracy.
Loading...