· Internal and external inspections of pressure vessels, heat exchangers, columns, heaters, furnaces, boilers, and piping systems
· Based on inspection findings, circulate recommendations to the maintenance team.
· After the repair, perform a site inspection and close out notifications in the Meridum software.
· Performed pre- and post-cleaning inspections, ensuring equipment readiness and compliance with quality standards
· Witnessed and monitored hydro, pneumatic, and chemical cleaning activities, including hydro jetting of heat exchanger tubes
· Supervised piping modifications, support modifications, and nozzle replacements in static equipment
· Carried out creep measurements for heater coils and ensured operational integrity
· Witnessed PSV valve testing, overhauling, and calibration, including pre-pop, final pop, CDTP, and back pressure tests
· Reviewed NDT reports, inspection test plans, and conducted corrosion analysis to estimate remaining service life