Systems Engineer
at SL Controls Ltd
County Mayo, County Mayo, Ireland -
Start Date | Expiry Date | Salary | Posted On | Experience | Skills | Telecommute | Sponsor Visa |
---|---|---|---|---|---|---|---|
Immediate | 13 Feb, 2025 | Not Specified | 14 Nov, 2024 | N/A | Archestra,Intouch,Slc500 | No | No |
Required Visa Status:
Citizen | GC |
US Citizen | Student Visa |
H1B | CPT |
OPT | H4 Spouse of H1B |
GC Green Card |
Employment Type:
Full Time | Part Time |
Permanent | Independent - 1099 |
Contract – W2 | C2H Independent |
C2H W2 | Contract – Corp 2 Corp |
Contract to Hire – Corp 2 Corp |
Description:
SKILLS BRIEF:
- Familiar with SLC500 & ControlLogix. Experience in Transaction Manager, Intouch, Archestra, Ignition for the purposes of collecting discrete event data would be highly desirable.
- Familiar with VB6, C#, SQL. Experience is RSBatch ‘soft phases’ would high highly desirable.
- Previous experience of SAP Hanna upgrades would be high highly desirable.
Responsibilities:
ROLE BRIEF:
The successful candidate will be responsible for recipe design, data uploads from the packaging machines & new PLC phase (&/or soft phase) creation/modifications.
You will also participate in automation and controls system projects towards specification, design, start-up, and commissioning in a cGMP environment.
Essential Duties and Responsibilities
- Creation of ‘universal’ Batch templates to eliminate site specific recipes at the batch layer and match proposed SAP phases and structures
- Modification of middleware download process to match the changes for the new recipe templates
- View client application changes to integrate planned functional changes primarily
- Integration of MII Quality and Instruction views
- Integration of resource selections made in SAP with shop floor resource selections (Tanks Attach, Attaching Filling etc)
- New PLC or Soft Phase creation to match SAP recipe designs
- Data extraction mechanism to create event messages for SAP from existing entries in the Batch History table (batchhis)
- Creation of a comprehensive upload package for all packaging machines to provide SAP with event times (like start/stop), SPC and performance events
REQUIREMENT SUMMARY
Min:N/AMax:5.0 year(s)
Information Technology/IT
Information Technology
Graduate
Proficient
1
County Mayo, Ireland