Fleet Renewal Long Term Planning Coordinator Aviation (M/F/X)
at Deutsche Post DHL
04435 Schkeuditz, Sachsen, Germany -
Start Date | Expiry Date | Salary | Posted On | Experience | Skills | Telecommute | Sponsor Visa |
---|---|---|---|---|---|---|---|
Immediate | 17 Dec, 2024 | Not Specified | 18 Sep, 2024 | N/A | Good communication skills | No | No |
Required Visa Status:
Citizen | GC |
US Citizen | Student Visa |
H1B | CPT |
OPT | H4 Spouse of H1B |
GC Green Card |
Employment Type:
Full Time | Part Time |
Permanent | Independent - 1099 |
Contract – W2 | C2H Independent |
C2H W2 | Contract – Corp 2 Corp |
Contract to Hire – Corp 2 Corp |
Description:
Would you like to become part of the most international company in the world? Would you like to make a difference? Then join our team.
European Air Transport Leipzig GmbH (EAT) officially started operations at Leipzig/Halle Airport in spring 2008 as an aircraft maintenance company and registered cargo airline. It is a wholly-owned subsidiary of DHL Group and belongs to the DHL Express division. In cooperation with DHL Air Austria and DHL Air UK Ltd., EAT covers the majority of the European DHL network.
For more information, please visit: European Air Transport Leipzig - Hub Leipzig - Deutschland (dhl.com)
A quick overview of EAT:
- 55 nationalities from all continents
- Own state-of-the-art Aviation Training Center
- 35 own aircraft, Airbus and Boeing
- Hangar size over 22,000 square meters
- Over 3 million parts in our aircraft maintenance warehouse
Responsibilities:
The Long Term Planning Coordinator Fleet Renewal supports the introduction of A/C into the European DHL fleet, supports extensive modification programs of the existing fleet and supports global fleet replacement programs on request.
- Technical and administrative support during the phase-in of aircraft
- Set up of the phase-in bridging check packages
- Generate pre-load material lists for the phase-in bridging check for the logistic department
- Create work orders for last performed checks to generate historical entries within TRAX
- TRAX removal and installation of parts during the phase-in bridging check
- Daily monitoring of the forecast during the integration of the A/C
- Input of required data into Maintenance Software system (Closing of single work orders and work packages)
- Final control of the performed work packages for completeness and archiving
- Generate technical reports
REQUIREMENT SUMMARY
Min:N/AMax:5.0 year(s)
Information Technology/IT
Production / Maintenance / Quality
Software Engineering
Graduate
Proficient
1
04435 Schkeuditz, Germany