Project Controls Specialist IV

at  Fluor Corporation

Santiago de Chile, Región Metropolitana, Chile -

Start DateExpiry DateSalaryPosted OnExperienceSkillsTelecommuteSponsor Visa
Immediate15 Feb, 2025Not Specified18 Nov, 2024N/AVendors,Contractors,CtlNoNo
Add to Wishlist Apply All Jobs
Required Visa Status:
CitizenGC
US CitizenStudent Visa
H1BCPT
OPTH4 Spouse of H1B
GC Green Card
Employment Type:
Full TimePart Time
PermanentIndependent - 1099
Contract – W2C2H Independent
C2H W2Contract – Corp 2 Corp
Contract to Hire – Corp 2 Corp

Description:

This position performs Project Control activities and/or supervises the preparation of Project Controls activities for a project or assignment. This role serves as Control Team Leader on small projects and provides direct supervision to a small team of Project Controls personnel, or as a Subject Manager Expert (SME) for the entire Project Controls Team in the Regional Office.

  • Develop Work Breakdown and Project Coding Structures for control and integrity of work defined by the contract
  • Develop totally integrated engineering, procurement, and construction (EPC) schedules or cost control programs
  • Recommend solutions or recovery plans to schedule or cost impact or delays
  • As a Lead Scheduler analyze schedule, review delays, propose schedule recovery alternatives and presents them to internal groups as well as the client
  • As Lead Cost Specialist maintain the cost system and provide required reports
  • Analyze variances in cost and schedule performance against the plan, and communicate the reasons for the issuance of variance and proposed mitigation plans to Project Management
  • Other duties as assigned

BASIC JOB REQUIREMENTS

  • Accredited four (4) year degree or global equivalent in applicable field of study and ten (10) years of work-related experience or a combination of education and directly related experience equal to fourteen (14) years if non-degreed; some locations may have additional or different qualifications in order to comply with local requirements
  • Ability to communicate effectively with audiences that include but are not limited to management, coworkers, clients, vendors, contractors, and visitors
  • Job related technical knowledge necessary to complete the job
  • Ability to learn and apply knowledge of applicable local, state/province, and federal/national statutes and guidelines
  • Ability to attend to detail and work in a time-conscious and time-effective manner

PREFERRED QUALIFICATIONS

  • Possess practical experience in the use of the automated cost or schedule management systems
  • Must have had leadership roles as a Control Team Lead (CTL) on a small-sized project or cost or scheduling lead on a large project
  • May need to travel internationally for project assignments and in support of business related matters

Responsibilities:

  • Develop Work Breakdown and Project Coding Structures for control and integrity of work defined by the contract
  • Develop totally integrated engineering, procurement, and construction (EPC) schedules or cost control programs
  • Recommend solutions or recovery plans to schedule or cost impact or delays
  • As a Lead Scheduler analyze schedule, review delays, propose schedule recovery alternatives and presents them to internal groups as well as the client
  • As Lead Cost Specialist maintain the cost system and provide required reports
  • Analyze variances in cost and schedule performance against the plan, and communicate the reasons for the issuance of variance and proposed mitigation plans to Project Management
  • Other duties as assigne


REQUIREMENT SUMMARY

Min:N/AMax:5.0 year(s)

Information Technology/IT

Site Engineering / Project Management

Information Technology

Graduate

Order to comply with local requirements

Proficient

1

Santiago de Chile, Región Metropolitana, Chile