Sr. Associate - Projects
at Cognizant
Kuala Lumpur, KL, Malaysia -
Start Date | Expiry Date | Salary | Posted On | Experience | Skills | Telecommute | Sponsor Visa |
---|---|---|---|---|---|---|---|
Immediate | 07 Nov, 2024 | Not Specified | 08 Aug, 2024 | N/A | Deliverables,Tmmi,Process Mining,Rally,Test Data,Knowledge Management,Case,Loan Servicing,Test Execution,Business Requirements,Adoption,Traceability Matrix,Process Optimization,Technology,It,Training,Automation,Maturity Models,Savings,Boot Camp | No | No |
Required Visa Status:
Citizen | GC |
US Citizen | Student Visa |
H1B | CPT |
OPT | H4 Spouse of H1B |
GC Green Card |
Employment Type:
Full Time | Part Time |
Permanent | Independent - 1099 |
Contract – W2 | C2H Independent |
C2H W2 | Contract – Corp 2 Corp |
Contract to Hire – Corp 2 Corp |
Description:
TEST MANAGER
Qualification:
Bachelors in science , engineering or equivalent
Responsibility:
Project Proposal:
- Gather requirements from the Business Analyst to understand the client’s requirements and the required skill sets.
- Analyze the time and effort required based on the initial estimation submitted by the Test Analyst.
- Seek review inputs on resourcing and estimation from the Test Manager.
- Create case studies to highlight experience / credentials for the proposals.
- Address clients’ queries in partnership with the BD team.
- Understand architecture design and peak volume transfer.
- Identify and assess different tools and propose the tool that matches with the clients’ requirements in collaboration with the Project Manager.
Knowledge Transition:
- Gather inputs from the business analyst and development team to understand technology, business requirements, test data requirements and application.
- Seek review inputs on reverse KT document from the client.
- Participate in KT session in case of new tools and technologies.
- Participate in the client meeting to understand the requirement.
- Design KT plan (that includes KT scope, schedule, and deliverables like reverse KT document) and share the same with the customer.
- Provide training to the associates as a part of reverse KT.
- Create portals to upload customer details, application and testing artefacts.
- Seek signoff on the requirement document (eg SRD) in coordination with different stakeholders (Development Team Lead, Business Sponsors, Technology lead, Project Manager, BA, Requirement Analyst).
- Create ROM (rough order magnitude) estimation to understand feasibility of the requirement.
- Support the Test Manager in performing high level impact analysis.
- Only For Onsite Coordinator: Provide support to BA at client side for identification/documentation of the requirements based on the experience.
Test Requirement Study:
- Understand and analyze the requirements (from the requirement document) to identify the testable requirements.
- Prioritize the requirements based on the time required.
- Create the traceability matrix.
- Create requirement query tracker (or clarification document) to track any clarification.
- Identify gaps in the requirements and take actions to close the same.
- Create ambiguity document (or clarification document) to track any clarification.
- Monitor the defects logged at the requirement stage.
- Identify gaps in the requirements and take actions to close the same.
- If requested, identify and document the test data requirement for the complicated projects.
- Review test data, screen flow documents etc Evaluate and identify various tools to aid test execution based on the understanding of the requirement.
Test Planning:
- Create the test strategy (that includes release date, type of testing, scope of the project, detail explanation of particular release, risk, critical defects) for small and medium projects.
- Seek review from the onsite team and seek sign off from the client on the same.
- Create/Review test plans (covering scope, risk, responsibility, timelines, resource (Man /Machine), deployment, exit/entry criteria etc).
- Identify the skill sets required and resources for the project.
- Seek review inputs from different stakeholders (Business Sponsors, Development Leads, Business Analyst, Project Managers).
- Seek sign off from the client on the same.
- Review/Create detailed estimate based on the scope and understanding of requirements.
- Communicate testing phase timelines to the team and seek approval from the Project Manager.
- Design an incident process in case of any environmental outage.
Test Design, Development & Execeution:
- Review the test scenarios and seek review as required.
- Track the root cause of the review comments and take actions to resolve them.
- Review the test cases and traceability matrix to ensure total coverage of requirements.
- Identify & create Test data required for the testing activity.
- Perform System test Execution.
- Track the downtime and report the same to the client.
- Review the test results and clarify doubts/query raised by team during execution.
- Review the defects logged by team and assign it to the right owner.
- Support the team/ client in conducting UAT/BUT if applicable.
- Perform sanity testing to ensure system readiness for testing.
- Upload the test cases in the QC.
- Validate readiness of the test environment for test execution.
- Prepare test lab for test execution in QC.
- Seek sign off from the client at various stages of the cycle as required.
- Monitor various builds delivered by the development team.
- Organize and conduct defect triage meeting.
- Only For Onsite Coordinator: Support Business Lead at client side to perform UAT.
- If requested identify the test data for UAT.
- Create Run Plan document that captures priority of test cases based on complexity.
- Monitor server counters (eg CPU utilization , memory utilization etc).
Process Optimization/ Improvements and Knowledge Management:
- Conduct/Coordinate training on clients’ applications to ensure training for the resource.
- Periodically, assess the technical capability of resources to ensure the selected resources are up to mark.
- Organize the boot camp for new entrants.
- Coordinate with team members, to upload the relevant document in knowledge management portals and keep it updated with the latest document.
- Select the team to create knowledge artefacts (eg collaterals, reusable assets) to drive knowledge management.
- Conduct CCP training with the help of academia and share the results with clients.
- Improvise already existing processes based on the experience.
- Institutionalize systems and processes in place to implement innovation suggestion made by the team (eg adoption of Cognizant proprietary best practices / tools, process optimization like usage of tools, automation, opportunity to utilize NLR products etc).
- Identify the time and cost savings made due to adoption of the best practices.
- Document the deferred defect information that will be captured during the next release.
Project Management & Release Management:
- Review the daily deliverables and share it with the stakeholders appropriately.
- Create and share weekly status reports and daily status reports with the team/ relevant stakeholders.
- Facilitate calls between onsite and offshore teams to discuss the project status.
- Identify resources based on the estimation and required skill set.
- (Only For Maintenance/Enhancements Project) Create estimation for enhancements based on the understanding of requirement.
- Perform POCs on the tools (eg accelerators, performance enhancers ) if required.
- Coordinate with the release manager to keep abreast with the various activities in the test environment (eg build schedule) and to ensure the right components move to the production.
Audit:
- Review all deliverables to ensure Test process protocols/ internal quality processes are meticulously followed in project.
- Participate in audit at various stages to check for adherence to the CTS processes and guidelines.
- Take appropriate actions on NCs/Obs reported (if any).
Metric Analysis & Reporting:
- Prepare daily / weekly metrics / SLA reports.
- Followup with the team to ensure that all metrics have been recorded correctly and at the right frequency for the audits conducted internally.
- Identify deviations and alert Test Manager on risks.
- Report reasons for deviations.
- Provide periodic update on the metrics to the client via Daily Status Reports/Weekly Status Reports/Monthly Status Reports.
Defect Prevention/ Leakage Retrospection:
- Conduct root cause analysis of the defects (UAT, rejected/duplicate defects etc) Create test closure summary reports (covering defects passed or failed ).
- Coordinate with the stakeholders to make gono go decision based on test results and test closure summary report.
- Schedule and Conduct Retrospection meetings with the stake holders.
- Document the lessons learnt(for the next testing phase/projects).
People Management:
- Conduct goal setting, performance apprais.
Must Have Skills
- ARIS Modeler Training
- ARIS Connect
- Manual E2E BPA
- Test Maturity Models (TMMi)
- Rally
Responsibilities:
Please refer the Job description for details
REQUIREMENT SUMMARY
Min:N/AMax:5.0 year(s)
Information Technology/IT
IT Software - QA & Testing
Software Engineering
BA
Business, Technology
Proficient
1
Kuala Lumpur, Malaysia