3rd Engineer (3/E) | Offshore - Wind Turbine Installation Vessel (WTIV)

at  OSM Thome

Nederland, Overijssel, Netherlands -

Start DateExpiry DateSalaryPosted OnExperienceSkillsTelecommuteSponsor Visa
Immediate12 Sep, 2024Not Specified17 Jun, 2024N/AInstructionsNoNo
Add to Wishlist Apply All Jobs
Required Visa Status:
CitizenGC
US CitizenStudent Visa
H1BCPT
OPTH4 Spouse of H1B
GC Green Card
Employment Type:
Full TimePart Time
PermanentIndependent - 1099
Contract – W2C2H Independent
C2H W2Contract – Corp 2 Corp
Contract to Hire – Corp 2 Corp

Description:

Join our team as a 3rd Engineer on our Wind Turbine Installation Vessel (WTIV) in the Netherlands.

Key Responsibilities:

  • Assist the Chief Engineer in the maintenance and operation of all machinery onboard
  • Perform routine maintenance and repairs on engines, generators, and other equipment
  • Monitor and control the vessel’s systems to ensure smooth operations
  • Follow safety procedures and regulations to maintain a safe working environment

Requirements:

  • STCW III/1 Engineer Officer of the Watch license
  • Experience working on offshore vessels preferred
  • Strong technical knowledge of marine engineering systems
  • Ability to work well in a team and follow instructions effectively

How To Apply:

Incase you would like to apply to this job directly from the source, please click here

Responsibilities:

Key Responsibilities:

  • Assist the Chief Engineer in the maintenance and operation of all machinery onboard
  • Perform routine maintenance and repairs on engines, generators, and other equipment
  • Monitor and control the vessel’s systems to ensure smooth operations
  • Follow safety procedures and regulations to maintain a safe working environmen


REQUIREMENT SUMMARY

Min:N/AMax:5.0 year(s)

Electrical/Electronic Manufacturing

Engineering Design / R&D

Electrical

Graduate

Proficient

1

Nederland, Netherlands