Packaging Manager

at  Heineken

Johannesburg, Gauteng 2000, South Africa -

Start DateExpiry DateSalaryPosted OnExperienceSkillsTelecommuteSponsor Visa
Immediate05 Jul, 2024Not Specified06 Apr, 2024N/AGood communication skillsNoNo
Add to Wishlist Apply All Jobs
Required Visa Status:
CitizenGC
US CitizenStudent Visa
H1BCPT
OPTH4 Spouse of H1B
GC Green Card
Employment Type:
Full TimePart Time
PermanentIndependent - 1099
Contract – W2C2H Independent
C2H W2Contract – Corp 2 Corp
Contract to Hire – Corp 2 Corp

Description:

  • Purpose of the job

The Packaging Manager is accountable for products packaging. He manages manpower, materials and energies in order to fulfil the Sales & Operational Plan, delivering, On Time and In Full, final products of the required quality at the lowest possible cost.

  • Key Responsibilities

People Management and Development:

  • Prepare training needs analysis and develop training plans accordingly. Monitor that training delivers the expected results.
  • Ensure career development is in line with the strategic business needs.
  • Maintain a good and healthy work environment in the department.
  • Apply Company’s policies in terms of recruitment, compensation and people development.
  • Conduct performance reviews for subordinates.

Plant and process operations:

  • Manage the packaging process, applying the Company’s Rules, Standards & Procedures.
  • Monitor process and product parameters, ensuring respect of specifications.
  • Actively collaborate with the Quality Department in order to interpret results (also making use of statistic tools) and use them as a leverage for improvement.
  • Facilitate GSC audits at the plant and implement corrective action when required.
  • Monitor and reduces extract losses whenever possible.
  • Ensure sampling plan is applied by packaging operators.
  • Support the Area Manager in establishing “lean” ways of working that can positively impact productivity.
  • Monitor OPI and make sure structural improvement plans are produced and implemented, also using TPM.
  • Ensure plant is operated according to the suppliers’ instructions and manuals.
  • Ensure plant is effectively maintained and planned maintenance is applied (SAHARA).
  • Prepare recovery plans, if necessary.
  • Manage modifications of process control and installation, ensuring respective manuals are updated.
  • Ensure formal failure analysis techniques are applied to recover in case of breakdowns (for instance, Breakdown Analysis, 5Why).

Programs and Systems:

  • Facilitate implementation of Company strategic programs (i.e., TPM).
  • Facilitate implementation of Company systems.

Investments:

  • Together with Plant Manager and Area managers, develop capacity plans in order to cope with the future brewery’s requirements.
  • Propose investments in order to improve the quality of the supply; the continuity of operations; the capacity of the installations and/or the productivity of the lines.
  • Support the Technical Department in managing the implementation and installation of the investments.

Planning:

  • Ensure adherence to production and packaging planning and deploys resources accordingly, in the most cost-effective way.
  • Ensure adequate stock of packaging and auxiliary materials is kept in order to secure continuity of operations.

Budget:

  • Drive continuous improvement and lean operation by ensuring that production output exceeds BOM and that HL/FTE is maximized.
  • Support the Area Manager in preparing the department budget, in terms of materials and human resources.
  • Monitor actual versus planned results and take effective measures in case of deviations.
  • Share results with team leaders in Packaging Department in order to have understanding and buy-in.

Environment:

  • Reduce Bulk losses.
  • Ensure waste reduction in the process.
  • Ensure that the packaging Department actively collaborates for the smooth operation – and within the legal limits - of the WWTP.
  • Create awareness in the organization about the correct operation of the WWTP.
  • Manage resource in a sustainable way; identify possibilities in order to reduce water and energy consumption.
  • Support the Energy Saving Program.

Safety:

  • Ensure plant operation is carried out in compliance with safety rules and regulations.
  • Enforce the use of PPE’s.
  • Make sure “Safe Work Permit” is carried out whenever necessary.
  • Proactively manage safety of contractors together with SHE Engineer and colleagues from Technical Department.
  • Promote implementation of Accident Registration and Analysis when necessary and support the SHE Engineer during the investigation of the root causes for accidents.
  • Make sure housekeeping is maintained to the highest standards in the Packaging Department.

Other deliverables:

  • Contribute to the Company’s Health & Safety Policy

Responsibilities:

  • Key Responsibilitie


REQUIREMENT SUMMARY

Min:N/AMax:5.0 year(s)

Other Industry

Production / Maintenance / Quality

Other

Graduate

Proficient

1

Johannesburg, Gauteng 2000, South Africa